COME CELEBRATE WITH US!

November 1, 2012 at 3:05 pm 2 comments

Friends of Magnolia Manor Park (“FMMP”) is pleased to announce a Grand Opening Celebration for the Magnolia Manor Park Off-Leash Area on Sunday, November 18, 2012 at 1 pm.  Festivities will take place in Magnolia Manor Park, 3500 28th Avenue West.  Ribbon cutting at 1:30 pm.

This slideshow requires JavaScript.

BUT FIRST, A LITTLE LIGHT WORK…

There will be a Work Party on Saturday, November 17th at 10 am (rain or shine!) at Magnolia Manor Park Off-Leash Area, 3500 28th Avenue West, to install some of the border plants and the poop bag stations (no, there’s just no ‘genteel’ way to say it), and to install a mock-up of the Lawton 2012 5th Graders’ Art Fence project.

Detail below…

Another Op’nin’, Another OLA…

Whoo-hoo!  Our long process is finally coming to a close.  Or rather, an Opening!  We are pleased to announce a Grand Opening Celebration for the Magnolia Manor Park Off-Leash Area on Sunday, November 18, 2012 at 1 pm.  Festivities will take place in Magnolia Manor Park, 3500 28th Avenue West.  Ribbon cutting at 1:30 pm.

We hope you’ve all been pleasantly surprised by all the progress these last few weeks.  The chips are down (and that’s a good thing…), as is the gravel, the water line is being installed and the OLA fence should begin installation after November 1st.  Seattle Parks Dept. (“Parks”) is bringing in soil amendments for the North border, and along with FMMP, consulting with the neighbors on the border plantings for the OLA, and P Patch.

Once the OLA fence is completely installed and Seattle Conservation Corps (“SCC”) has cleaned up the work site, Parks will arrange for the exterior fence along 28th Avenue West to be removed, and the park will re-open.  That will probably take place between November 9th and November 17th.  Both Seattle Parks and Friends of Magnolia Manor P (“FMMP”) are committed to the idea that the park should be closed for no longer than necessary for construction and that includes the OLA. So, yes, if it’s ready before the 18th, the OLA WILL be open for business.

Just like any new business, though, some things take time.  Parks will provide a kiosk, a tool box and signage, but they may not be in place in time for the opening. The water also may not be completely hooked up for a few weeks. Rest assured–they are coming!

There will be a Work Party on Saturday, November 17th at 10 am (rain or shine!) to install some of the border plants and the poop bag stations (no, there’s just no ‘genteel’ way to say it), and to install a mock-up of the Lawton 2012 5th Graders’ Art Fence project.  Installation of the rest of the plants and trees, and the Art Fence, will take place over the next several months, as time, weather (and donations) allow. There will be another celebration with the Lawton 2012 5th Graders’ and their families once the installation of the Art Fence is scheduled.

Along with the OLA opening, the Magnolia P Patch is taking shape.  By the 18th, the security fencing will have been moved and rough grading in the P Patch area done. It may be possible to tour the area of the future P Patch at the Grand Opening—we’ll have to see.  The grand opening celebration for the P Patch will take place next spring.

Please mark your calendars for the Work Party at 10 am on November 17th and for the Grand Opening at 1 pm on November 18th, and come say “Thank You” to all of our great sponsors and donors!  Without them, MMP OLA would not have happened.

Entry filed under: Events, News, Observations, Off Leash Area, P-Patch. Tags: .

PARK P-PATCH PHASE 1 IMPLEMENTATION MEETING “Art for the Park” Calendars for sale!

2 Comments

  • 1. L F  |  December 14, 2012 at 10:37 am

    It’s great that the off leash area is completed and the P-patch is getting started. But already I think we need a little maintenance… both of the big yellow projects signs have been “tagged”, which is pretty unsightly. Can we get them replaced or removed? Also, the off leash area has some black construction materials still in place on the east side… can that be removed?

    thanks parks folks!

    • 2. Jj  |  December 29, 2012 at 12:17 am

      The park looks great. A nice inviting area for the neighborhood. But I agree with above poster. The tyvek and left over sod looks pretty bad an leave the park seeming unfinished


Click to Donate On-line

Park Photos on Flickr

Tool Shed

Susan Casey, emcee & Pres of FMMP

Sharon Knoll, FMMP fundraising

Sally Clark, City Council President